Fujian Sangang Group - Sanming Complex Wash Station Cluster
Steel & Metallurgy

Fujian Sangang Group - Sanming Complex Wash Station Cluster

Batch deployment across four process sub-projects: resources technology, high-speed wire, CISDI blast-furnace package, pelletizing
客户:福建三钢集团(三明本部) · 服务方:上海臻欧实业发展有限公司(凯美龙 KAMRON)
← ← Back to all cases

Overview

At the Sanming complex of Fujian Sangang Group, KAMRON successively equipped automatic wash stations for four process sub-projects: the Resources Technology Company, the high-speed wire mill, the CISDI blast-furnace general contract package and the pelletizing plant. Different processes and site conditions within one steelworks imposed differentiated requirements on bay width, drying length, total power and foundation load - a textbook case of multi-unit replication inside a single group.

Client Profile

The Sanming complex of Fujian Sangang Group is a full-flow integrated steelworks whose material flow spans sintering, pelletizing, blast furnace, high-speed wire and resource utilisation. Vehicle types and traffic volumes differ markedly between process outlets; some sites sit inside or hard against existing buildings with tight space, while others are new yards with room to spare.

The Challenge

  • Site conditions, traffic volumes and washing requirements differed across the four sub-projects, so no single model could cover them all.
  • The high-speed wire site was constrained by existing building headroom to roughly 2.2 m, requiring chassis and side washing plus effective drying within a low space.
  • The blast-furnace package needed layouts for several outlets simultaneously, with wash-zone lengths ranging from 12 m to 15 m.
  • Pelletizing vehicles are large and dusty, calling for a longer wash bay, stronger drying capability and a foundation rated for 150 tonnes.

The Solution

Using the KM-H3 platform as the baseline, KAMRON configured each sub-project individually: for Resources Technology, a 10 x 4 x 5.5 m wash zone with a 5 x 4 x 5.5 m drying zone in a 15 m unit; for high-speed wire, a wash zone compressed to 10 x 4 x 2.2 m with 5 x 4 x 2.2 m drying to suit building headroom; for the CISDI blast-furnace package, two wash-zone options at 12 m and 15 m; for pelletizing, a 13.5 x 4 x 3 m wash zone with 4.5 x 4 x 3 m drying in an 18 m unit. All units use modular grouped construction with Q235 cold-rolled carbon steel, folded and hot-dip galvanised for corrosion protection.

Project Details

  • One platform configured per sub-project gives the owner consistent operation and maintenance practice across four processes, sharply reducing spares and training cost.
  • The high-speed wire unit washes and dries within 2.2 m headroom, avoiding extra civil spend on modifying the existing building.
  • Pelletizing combines four 7.5 kW side fans with two 5.5 kW floor fans for 110 kW total, keeping mud off the road in a heavy-dust duty.
  • Modular grouped construction across units allows transport and on-site lifting in sections, shortening shutdown windows.
  • Hot-dip galvanised and coated structure suits the corrosive combination of steel-plant dust and moisture.

The real challenge with a group-level customer is not a single machine but making one platform land on wildly different process sites. By pairing one platform with four parameter sets, this project accommodated both the 2.2 m low-headroom wire mill and the 18 m heavy-duty pelletizing bay within one technical family - that scalable configuration is the precondition for batch replication.

Project Gallery

Ready to upgrade your wash system?

Tell us your vehicle types, site layout and washing needs — KMRON engineers will reply within 2 business days with a tailored proposal and quote.