CNMC Southeast Copper - Smart Wash Bay for Raw Material Logistics
Non-ferrous & Mining

CNMC Southeast Copper - Smart Wash Bay for Raw Material Logistics

Compact smart wash bay with integrated plate recognition - for the constrained lanes of a copper smelter
客户:中铜东南铜业有限公司 · 服务方:上海臻欧实业发展有限公司(凯美龙 KAMRON)
← ← Back to all cases

Overview

The raw material logistics and intermediate cold-charge crushing project of CNMC Southeast Copper needed vehicle washing within tightly constrained plant lanes. KAMRON responded with short-bay KM-H3 smart wash stations at 8 m and 10 m, paired with integrated plate recognition and barrier gates, achieving unattended washing and recording on a restricted footprint.

Client Profile

Located in Fujian, CNMC Southeast Copper is a copper smelter. Vehicles in the raw material logistics area are mainly copper concentrate and cold-charge carriers, and the interface between roadway and buildings is tight, leaving limited length for a wash station. With strict control over mud carry-out and dust escape, the wash bay had to balance washing performance against site fit.

The Challenge

  • Lane length was too short for the conventional 15 m or longer bay, so chassis and side washing had to complete within an 8-10 m run.
  • Each inbound vehicle had to be individually identified and logged to support material-flow tracking and ultra-low-emission ledgers.
  • With dust and moisture together in a copper smelting environment, the machine body and wash piping needed long-term corrosion resistance.
  • Barrier gates had to allow manual release during power failure so in-plant logistics would not be blocked.

The Solution

KAMRON adopted the short-bay KM-H3 approach: the smart wash station measures 10 x 4.6 x 2 m and the wheel-wash unit 8 x 4.6 x 2 m, with a 4 m clear passage. The steel structure uses GB Q235 cold-rolled carbon steel, folded as one piece, hot-dip galvanised and then coated; wash piping is DN50 galvanised steel with 304 stainless treatment, and nozzles are 304 stainless. The foundation is designed for 150-tonne traffic and wash water is collected and reused. Barrier gates and integrated plate-recognition cameras are fitted at the entry and exit; during power failure the gate can be raised by hand-crank and resets automatically when power returns.

Project Details

  • Completing chassis and side washing within an 8-10 m run brought lanes that could not host a conventional long bay into compliance.
  • The integrated plate-recognition camera covers identification, imaging, storage and fill light in one unit, identifying and logging inbound vehicles at compact build cost.
  • The crank-link gate mechanism allows hand-cranking during power loss and auto reset when power returns, so equipment faults never block in-plant logistics.
  • Q235 hot-dip galvanising with anti-rust coating, plus 304 stainless piping and nozzles, suit the dust and moisture of a copper smelter.
  • A 150-tonne-rated foundation and wash-water reuse cut fresh-water draw and discharge.

On smelter and chemical sites, available lane length often constrains a project before machine capability does. This project shows that compressing the wash run to 8-10 m while integrating recognition and barrier control into a compact in/out unit is the more pragmatic route for constrained lanes.