Shanghai Meishan Steel - Five Wash Systems Across Four Material Yards
Steel & Metallurgy

Shanghai Meishan Steel - Five Wash Systems Across Four Material Yards

Lime kiln yard, No.2 blast-furnace slag yard, B2 auxiliary yard and main blending yard B1 - four-stage settling with water recycling
客户:上海梅山钢铁股份有限公司(买方:南京绿森环保科技有限公司) · 服务方:上海臻欧实业发展有限公司(凯美龙 KAMRON)
← ← Back to all cases

Overview

Shanghai Meishan Steel successively equipped vehicle wash systems at four points - the lime kiln yard, No.2 blast-furnace slag yard, B2 auxiliary yard and main blending yard B1 - with Nanjing Lusen Environmental Technology as buyer contracting KAMRON. Across the four projects five units were delivered, all using four-stage settling tanks for wash-water recycling, with nozzle counts and coverage heights set by site.

Client Profile

Shanghai Meishan Steel is located in Yuhuatai District, Nanjing. The site has a basic seismic intensity of 7 degrees, design peak ground acceleration of 0.1 g, seismic group 1, site soil Class II and characteristic period T = 0.35 s. Ambient conditions give a coldest-month mean humidity of 69 percent and hottest-month 90 percent, atmospheric pressure of 102.54 kPa in winter and 100.55 kPa in summer, and a maximum annual rainfall of 1825.8 mm against a mean of 1051.9 mm.

The Challenge

  • The four yards serve lime kiln, blast-furnace slag, B2 auxiliary material and main blending duties respectively, with different vehicle types, bed heights and material behaviour, so nozzle coverage heights had to be set individually.
  • Wash water had to be settled, oil-separated and recycled, with stages two to four easy to clean periodically and stage one clearable by excavator.
  • With high local rainfall (up to 1825.8 mm a year), baffles were needed on both sides and the top of the wash and drying zones to contain water.
  • High pressure and small orifices required filtration before the nozzles, holding suspended particles to 1 mm or less.
  • At the blast-furnace slag point, tall beds required nozzles covering the vehicle exterior below 3.6 m plus the full chassis.

The Solution

KAMRON configured each point separately. The lime kiln yard received one custom KM-H3 with a 12000 x 4600 x 5500 mm wash zone and 4000 x 4600 x 5500 mm blow-off zone in a 16000 x 4600 x 5500 mm unit; nozzles cover the exterior below 3.7 m plus the full chassis, with at least 65 per side and 70 under the chassis - 200 or more in total - at not less than 1.5 MPa. Three high-pressure pump sets (22 m3/h, 160 m head, 15 kW each) drive the system at AC380V 120 kW, 700 L per vehicle and 40-60 vehicles per hour, with YE3 or better motors, 7.5 kW side and 5.5 kW floor fans rated IP56 with NSK bearings, and heavy steel grating trench covers of at least 8 mm square steel, hot-dip galvanised as a whole. The No.2 blast-furnace slag yard received one unit with coverage below 3.6 m, at least 60 nozzles per side and 70 underneath - 190 or more in total. The B2 auxiliary yard received one unit with coverage below 1 m, at least 192 side and 100 under-chassis nozzles - 292 or more in total. The main blending yard B1 received two units with the same nozzle array, a drying system delivering 5712-10562 m3/h from eight 11 kW fans and a foundation rated for 120 tonnes. Every point uses a four-stage settling tank with settling and oil separation for water recycling, and baffles on both sides and the top of the wash and drying zones.

Project Details

  • Each yard was tailored by coverage height and nozzle count, matching every unit precisely to local vehicle types and bed heights.
  • Four-stage settling with oil separation and 1 mm filtration keeps wash water in stable circulation at the rainy Nanjing site.
  • Baffles on both sides and the top of the wash and drying zones contain water and limit road wetness across the plant.
  • Heavy grating covers of at least 8 mm square steel, hot-dip galvanised as a whole, resist repeated heavy traffic without deforming.
  • Uniform YE3 or better motors plus combined side and floor fan blow-off balance energy use against drip-free vehicles.

For one customer at four points within one plant, requirements can differ enough to swing nozzle counts by more than a hundred. Rather than forcing model uniformity, this project let coverage height and nozzle density follow the duty while standardising shared subsystems such as settling tanks, baffles and filtration precision. That pairing of common standards with individual parameters is what keeps quality stable across a batch.