业主方:冀建投寿阳热电有限责任公司 · 总承包方:中南电力设计院 · 设计方:山西省电力勘测设计院 · 供货方:上海臻欧实业发展有限公司(凯美龙)
← ← Back to all cases

Overview

A supporting automatic wash system for the Shouyang Mingtai 2×350 MW low-calorific-value coal-fired power project. Against three constraints — an extreme low of -29.4 °C in a high-cold region, six-axle coal truck access and reuse of coal-bearing wastewater — the result is a tunnel gantry system with freeze protection and a self-contained water loop.

Client Profile

The plant is located in Wenjiazhuang Township, Shouyang County, Jinzhong City, Shanxi Province — a loess hilly, high-cold region at an average elevation above 1,300 m with a temperate continental climate and long, cold, dry winters. Process water comes from the Shouyang County wastewater treatment plant (reclaimed water), with the Songta Reservoir surface source for domestic and standby process water. Peak ground acceleration is 0.10 g (seismic intensity VII); the site soil is medium-stiff, Class II.

The Challenge

  • Extreme minimum temperature of -29.4 °C, maximum frozen-ground depth of 111 cm and maximum snow depth of 22 cm make winter operation and freeze protection the primary challenge.
  • Plant vehicles are six-axle coal trucks; the station must allow them to pass, with a clear passage width of 4 m.
  • External water supply is treated coal-bearing wastewater (typically SS ≤10 mg/L, pH 6–9); fluctuations in water quality must be fully accounted for.
  • The equipment is installed indoors; sufficient maintenance access and space must be preserved inside the room.

The Solution

Washing and recovery form one closed loop: the station uses its own recirculated, settled wash water; the 13.5 m wash zone connects in series with a 9 m air-dry/shake zone where the vehicle dries in place before leaving; the whole system is freeze-protected and heat-traced. 设备内部 · 高压冲洗区 | Inside the station · high-pressure wash zone Site-specific design — Tunnel gantry configuration: wash bay 22.5 m × 4.5 m × 5 m (internal), clear passage width 4 m; 13.5 m high-pressure wash zone plus 9 m air-dry/shake zone, total design length 22.5 m. Full-vehicle coverage — All-round high-pressure washing comprising side, underbody and floor systems; underbody orifices and twin side nozzles wash at a height of ≥1.4–3 m at ≥1 MPa. Sensing and safety — No fewer than two microwave sensors with dual-signal interlock prevent false starts when people pass; a further sensor at the exit provides the stop signal; the wheel stop has fast lift and radar anti-collision. Freeze protection and recirculation — The DN50 galvanised main supply line is freeze-protected; insulation uses mineral wool plus heat-tracing tape. Water consumption is 20–40 L per vehicle, wash time is settable from 1 to 10 minutes, and wash water is recirculated after settling.

Project Details

  • 冲洗区与风干抖车区 | Wash zone and air-dry/shake zone
  • Drivers simply drive slowly into the wash area; the machine starts washing automatically and brings the pumps on in sequence. After in-place air drying the barrier lifts and the vehicle leaves — no manual intervention throughout.
  • Wash control can be switched between automatic and manual. The control cabinet is an outdoor, stainless-steel, double-door design with a reputable-brand PLC inside.
  • Structural steel and frames are mainly Q235 carbon steel, fully hot-dip galvanised after fabrication and finished with an external anti-corrosion powder coat.
  • Water consumption is 20–40 L per vehicle; wash water is recirculated after settling, and make-up water is treated coal-bearing wastewater.
  • The system is freeze-protected and heat-traced to meet winter operating requirements at the site’s extreme low of -29.4 °C.

For a power-plant wash system in a high-cold region, freeze protection is a design premise rather than an add-on. Only by considering heat tracing, water recirculation and the site constraints of six-axle coal trucks and coal-bearing wastewater together can the equipment remain genuinely usable at -29.4 °C.

Project Gallery