Overview
One of China’s largest large-scale filling-method underground iron mines. A fully enclosed heavy-vehicle wash station was custom-engineered as an integrated enclosure, delivering full-coverage forced washing of wheels, body panels and chassis, with three-stage settling and closed-loop water reuse.
Client Profile
The Shougang Macheng iron mine is a super-large filling-method underground mine under construction, with a combined mining-and-processing capacity of 22 million t/a (15 million t/a in the upper district and 7 million t/a in the lower district, mined simultaneously). The wash station was procured mainly for heavy vehicles entering and leaving the plant via No. 2 auxiliary shaft, and is installed on the No. 2 auxiliary shaft industrial site, at the inner-side exit of the No. 2 auxiliary shaft gate. KAMRON was responsible for design, fabrication, installation, commissioning and trial operation until the equipment ran normally.
The Challenge
- Continuous duty; vehicle payload ≥150 t; cleaning envelope ≥13.5 m × 4.6 m × 5.5 m (L×W×H).
- Throughput ≥20 vehicles/hour; wash pump total flow ≥60 m³/h at 1 MPa washing pressure.
- The washing system must force-wash the underbody, body panels and wheels in full coverage — the core pain point for heavy mine vehicles.
- Drainage trenches silt up easily; self-cleaning high-pressure nozzles are required for both transverse and longitudinal trenches.
- The station must interlock with the plant-gate barrier to enforce washing (no wash, no exit).
- Piping must be insulated by wrapping plus heat-tracing tape, with insulation thickness of no less than 40 mm.
The Solution
Washing and recovery were engineered as one closed loop: the equipment body is integrated with the enclosure; the wash zone and the air-dry/drain zone are connected in series; wash water passes through three-stage settling into a clear-water tank and is recirculated by the wash pump, while silt is collected in a dedicated basin with inspection ports for periodic desilting. 现场定制 · 与封闭房一体化设计 | Site-specific · integrated with the enclosure Site-specific engineering — The equipment body is integrated with the enclosure at 13.5 m × 4.6 m × 5.5 m; zones are divided into a 9 m wash zone and a 4.5 m air-dry/drain zone. Full-vehicle coverage — 360° high-pressure washing: 4 sets of side-column wash lines, 4 sets of side high-pressure tyre wash lines and 1 set of underbody wash line; 304 stainless steel oscillating, direct-jet and desilting nozzles. Sensing and safety — Infrared/radar sensing with licence-plate recognition and video monitoring (2 HD cameras + recorder + storage disk), interlocked with the barrier; fast-folding sealed doors at the entry and exit. Equipment and recirculation — 3 centrifugal pumps at 15 kW / 20 m³/h / 160 m head; 6 air-dryers at 5.5 kW; 3 slurry pumps. Three-stage settling plus a clear-water tank with ultrasonic level sensing for automatic make-up water.
Project Details
- 设备内部实拍 | Inside the wash station
- Throughput ≥20 vehicles/hour (adjustable), supporting continuous heavy-vehicle traffic at the mine.
- Closed-loop wash water: after three-stage settling the water enters a clear-water tank for recirculation, requiring only a small amount of make-up water.
- Control uses a Siemens S7-1200 PLC with touch screen, providing automatic make-up water, level detection, false-trigger prevention (no start-up when people pass) and pump start/stop control; operating data is collected and stored for six months with per-vehicle wash records.
- All motors are energy-efficient; low-voltage motors are YE4 series or Grade-2 energy-efficiency products.
- Warranty of 12 months; response within 2 hours and on-site attendance within 48 hours if required; two routine inspections per year; installation, commissioning and training no less than 15 days.
For a super-large mine, a wash station is not merely an environmental facility but an enforced exit checkpoint. Only by integrating equipment, enclosure, barrier and monitoring into one system can washing performance be guaranteed without hurting plant traffic efficiency under heavy traffic, heavy vehicles and tight schedules.